Application:
1, In the construction engineering industry, the machine is used for horizontal and vertical transferring and spraying mortar or cement.
2. In the chemical and paper industry, delivering the raw pulp material and waste materials.
3. In coal-fired power plants, the machine is used to deliver the fine coal mortar.
4. In the mining tunnel construction industry, the machine is used to grout and protect the slope


Specification:
SPECIFICATIONS FOR MOTOR SPRAYING MACHINE | |||
Model | HW-51J MORTAR SPRAYING MACHINE | Air compressor | 2 sets |
Max. grain size | 10mm | Pressure | 8Mpa |
Voltage | 380V | Pipe diameter | 51mm |
Delivery height | 40m | Power | 13.5Kw |
Horizontal delivery distance | 80m | Mixer size | 700*500mm |
Hopper capacity | 50L | weight | 380kg |
Water:Mother:Sand | 1:1:3 | Packing size | 210*80*145cm |
Product Introduction
A mortar spraying machine is mainly used for building internal and external wall surfaces. goods mixed mortar, putty powder, refractory coating, and pressure grouting.
Working principle
It is feed cement or other products into the feeder, and mixing slurry under the action of screw pump, is pressurized continuous discharge, and along the pipeline conveying forward, arrived at the nozzle is introduced into the wind, slurry under the action of wind, jet formation, and spray on the wall surface.

Operating remark:
1. Before each shift, first press the hand oil pump several times to fill the transmission part.
2. After turning on the power, first start the main motor, and check whether the rubber conveying spiral rotation direction is consistent with the direction indicated by the arrow. If it is inconsistent, replace the power phase line. Note that this check is performed each time the power is turned back on.
3. Connect the hose and nozzle. Add 5 liters of clean water to the hopper, start the motor and pump out the water to wet the hopper, pump body, and conveying hose. After pumping most of the water out, you can stop it.
4. Add the proportioned mortar (or paint) to the hopper, start the air compressor and the damper, and start spraying.
5. After the work is finished, immediately drain the remaining material in the hopper, inject enough water into the hopper to thoroughly clean the hopper, and then pump it out to clean the hose and the nozzle until the pump is full of clean water. Only after the cleaning is over. In order to avoid the residual material condensing in the hopper, hose, and nozzle, plugging the hose and the nozzle, affects the service life of the equipment.
FAQ
1. Q: Are you a trading company or a manufacturer?
A: We are an original equipment manufacturer.
2. Q: How long is your delivery time?
A: It is according to the model and quantity.
Generally, it is 3-5 days if the machines are in stock.
It will be 15-30 days if you want to customize the machines.
3. Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer you the sample machine.
But it's not free. You need to pay for the sample and the cost of freight.
4. Q: What are your terms of payment?
A: We accept T/T, Western Union, Money Gram, Paypal, Alibaba Escrow, etc.
Payment<=USD 5000, 100% in advance.
Payment>=USD 5000, 30% T/T in advance, balance before shipment


Hot Tags: mortar spraying machine, electric shotcrete machine/gunite machine, manufacturers, suppliers, factory, wholesale, buy, cheap, low price



