Products
Dual Liquid Cement Grouting Pump|hydraulic
video
Dual Liquid Cement Grouting Pump|hydraulic

Dual Liquid Cement Grouting Pump|hydraulic

Features:
1. The pump can not only be used for grouting one kind of fluid but also for grouting two kinds of fluid. And it can be used as a clean water pump, sewage pump, and mud pump
2. The pump adopts hydraulic transmission, so it has a small volume, is lightweight, has stable performance, reliable operation, and simple operation.
3. The pressure is adjusted arbitrarily in the design range. When the pressure exceeds the set value, the overflow valve opens the system to release the pressure, thus providing protection.

Contact:

Summer Zhu

Mobile/Wechat/Whatsapp: +86 13571973823

Email: summer@ztmineequipment.com

Description of hydraulic grouting pump:

Hydraulic grouting pump is suitable for grouting and water blocking, filling voids, reinforcing broken rock formations, etc. in mines, tunnels, water conservancy, subways, buildings, bridges, and other construction sites.

 

hydraulic cement grouting pump-05uv Hydraulic grouting pump-02mn.jpg

Parameters of hydraulic grouting pump:

Hydraulic grouting pump-02hi

Contact:

Summer Zhu

Mobile/Wechat/Whatsapp: +86 13571973823

Email: summer@ztmineequipment.com

Operating remark:

1. Before each shift, first press the hand oil pump several times to fill the transmission part.

2. After turning on the power, first start the main motor, and check whether the rubber conveying spiral rotation direction is consistent with the direction indicated by the arrow. If it is inconsistent, replace the power phase line. Note that this check is performed each time the power is turned back on.

3. Connect the hose and nozzle. Add 5 liters of clean water to the hopper, start the motor and pump out the water to wet the hopper, pump body, and conveying hose. After pumping most of the water out, you can stop it.

4. Add the proportioned mortar (or paint) to the hopper, start the air compressor and the damper, and start spraying.

5. After the work is finished, immediately drain the remaining material in the hopper, inject enough water into the hopper to thoroughly clean the hopper, and then pump it out to clean the hose and the nozzle until the pump is full of clean water. Only after the cleaning is over. In order to avoid the residual material condensing in the hopper, hose, and nozzle, plugging the hose and the nozzle, affecting the service life of the equipment.

Contact:

Summer Zhu

Mobile/Wechat/Whatsapp: +86 13571973823

Email: summer@ztmineequipment.com

Hot Tags: dual liquid cement grouting pump|hydraulic, manufacturers, suppliers, factory, wholesale, buy, cheap, low price

Send Inquiry