Overview
condition: new | max conveying distance: 60/30m | place of origin: Shannxi China |
max aggregate size: 4mm | voltage: 380v/50hz | Dimension:(L*W*H):1560*60*1100cm |
certification: CE&SGS | Brand name: ZT construction. | Application: spraying the wall &ceiling |
Max pressure: 3MPA | Warranty: no after servies over seas, but video technical guide. | Color: customized |
weight: 360kg | power: 7.5kw | supply ability: 100 sets a month |
Delivery: | any port of China typically Shanghai |
Packaging | wooden case with double inner blister package |
payment | T/T or L/C at sight |
product details
Operating manual
1. Before starting, add fresh water into the hopper and regulate the speed to the middle-high speed in order to achieve the effect of wetting the pipe, only a short running, and then draining the water.
2. Putting the even material stirred into the hopper, and then locking pulp exit of main machine and the pipe & nozzle.
3. Before spraying, fill the pressure of the air compressor to 8kg (matched air compressor 0.26-0.36m) and then connected it to the nozzle.
4. After connecting to power, put the gunpoint aiming the hopper, adjusting the air pressure and the speed until achieving the best state of fogging, shutting down the machine but non-stop wind.
5. After the accurate Debug, immediately move the nozzle and spray jets to the construction site work.
6. During the construction process, the pipe is filled with paints, not suitable for parking for too long. If the power is a failure, you should immediately dismantle the pipe to clean it.
7. If filling pressure in the pipe, before dismantling & cleaning, you must put the cloth on it to protect your eyes, avoiding injury.
8. If starting the machine fails, first check whether the fire drill is broken or not and should replace it immediately.
9. Cleaning the body during the working or completion, making sure no wetting the electric drill & box, avoiding damage.
10. After completion of working, must clean up the hoppers, pipes, nozzles, and rotary joints so as to work tomorrow
11. If detecting the exit of coating is weak power after a long time to work, you have to replace the pressure pump.
12. If it suddenly appears without feeding material in the work, while the motor is still working, it proves that the nozzle has been plugged. You should immediately stop working and clean the nozzle, and then continue to work.
13. The nozzle is damageable (including the pressure pump). The standard nozzle pore is 4mm. When the fogging of the nozzle is not satisfactory, you should immediately replace the nozzle.
14. When manual operation, you should wear a safety helmet, glasses, and protective clothing.
Notice
1. The construction site must wear protective equipment (such as gloves, masks, goggles, safety helmets)
2. Water and electricity should be provided on-site.
3. The hand shall not be in the hopper when driving.
4. The construction site should be safe, covered, and smooth.
5. Machinery and circuit should avoid to exposure in the wet and open places.
FAQ
1. Q: Are you a trading company or a manufacturer?
A: We are an original equipment manufacturer.
2. Q: How long is your delivery time?
A: It is according to the model and quantity.
Generally, it is 3-5 days if the machines are in stock.
It will be 15-30 days if you want to customize the machines.
3. Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer you the sample machine.
But it's not free. You need to pay for the sample and the cost of freight.
4. Q: What are your terms of payment?
A: We accept T/T, Western Union, Money Gram, Paypal, Alibaba Escrow, etc.
Payment<=USD 5000, 100% in advance.
Payment>=USD 5000, 30% T/T in advance, balance before shipment
Hot Tags: cement mortar sprayer, concrete spraying machine, wall cement sprayer, manufacturers, suppliers, factory, wholesale, buy, cheap, low price