1, equipment work place
Installation site must have enough and continuous supply of water, so as to ensure mixing and cleaning, raw materials easy to take and place, the equipment work place and the filled mud construction site closer, beating efficiency is higher. It is also necessary to consider the discharge and disposal of the liquid residue in the flushing equipment.

2, operation instructions
Before grouting pump start , turn off the main power system, and the pulping system carefully check mixing, determine any irrelevant things and residual material, then all joints beating system are firmly installed, also the manual valve, the lever is in the "neutral" or "off" state.
Be careful
Mud grouting pump must be sent to the material itself lubrication, no liquid can not start, otherwise it will cause damage to the system parts.
A and water test run
Open the main power supply, and observe the hydraulic system running pressure, flow is normal, if the pressure does not appear immediately, turn off the power supply, take appropriate measures to reverse rotation.
Open the water valve to add water to diffuse through the stirrer blade, open the manual valve, "host" forward, "in a" stop ", the" reversal of hydraulic motor to rotate, manually adjust speed, check the story, reverse and stop mixing system is normal, open the mixer outlet will be charging the bucket is filled with water, close the valve. Try another blender process, ditto.
Open the manual valve, and then slowly rotate speed control valve (0-10), the mud pump with reciprocating stepless speed to low voltage startup, prior to discharge into the hopper of the water pump and check system, beating all connection hose leaks and blocked, mud pump operation is not normal, row clean mud pump all the water inside the pipeline and valve closing system.
After examination, hydraulic system and mixing system, the beating system is all normal.
B, material operation
The specific operation process is the same as the water test run. In production, the first boiling water valve according to a certain proportion has added various materials mixing, to work to check the hydraulic system, mixing system and pulping system, encountered abnormal problems to take measures immediately, to prevent the accumulation of material.
C, stop running
In the continuous production without stopping, but because of the beating process of various factors need to stop running, stop to the mixer barrel and all raw materials, but must be washed with water, the blender discharging the materials in the feed hopper, with all pump system, carefully cleaning all kinds of parts, all contact with the material mixing system, blade a baffle, a discharge port and a feed hopper, the above material rushed to the feed hopper, closed agitator.