Operation steps of strand pusher machine:


1. First of all, the preparation work should be done well:


(1) Check whether the electrical circuit is intact, check the oil level position in the reducer.


(2) Check whether the motor rotation direction matches the direction marked by the arrow on the cabinet.


(3) Turn on the power supply, and make sure that the direction is reversed.


2.After the preparation work is completed, it will work normally:


(1) Insert the steel hinge wire of the rack from the inlet of the machine, and jog the wire entry button switch, so that the steel hinge wire slowly penetrates into the machine, enter the reserved hole along the catheter to the other end to reach the reserved sheet Pull the size and cut it with a hand-held sand turbine.


(2) When the conveying distance cannot be reached, the spring screw on the machine can be adjusted to press the spring screw until it meets the working requirements, but it cannot be adjusted too tight, so as to avoid aggravating the wear of the pressure wheel and reducing the service life during operation.


(3) When working, pay attention to whether the operation is normal. When any fault is found, it should be shut down immediately, and the cause should be found to eliminate the fault before starting.


The beaming machine can not only work but also maintain:


1. Regularly check the degree of wear of the lubricating oil and pressure roller in the stranding machine of the stranded wire. If the pressure roller is not adjusted to the degree of use, it should be replaced in time.


2. After each use, the stranding machine should be placed in a dry and rain-free environment.


The strand pusher machine can travel between 40-180 meters of stranded steel wire, and the configurable motor power is: 4kw, 5.5kw and 7.5kw. Choose the one that suits you according to the length of the customer's bridge.