Wire Stressing Jack Post-Tensioning System For Bridge Construction
video
Wire Stressing Jack Post-Tensioning System For Bridge Construction

Wire Stressing Jack Post-Tensioning System For Bridge Construction

•Minimum Order Quantity: 1 Piece
•Capacity:27 Ton
•Size:180*568 mm
•Color:YELLOW
•Strand Dia Avaliable:9.6mm, 12.7mm, 15.24mm & 17.8mm strand
•Packing: Wooden Box


Product Features

1. Mono strand jack is mainly used for single-hole tensioning. It can also be used for porous preloading, tensioning, and troubleshooting, and can be applied to high-strength steel wire bundles and steel strands of various sizes.

2. Installation and construction are very convenient: no need to rotate the arbitrarily installed working anchor; no need to rotate the radial direction of the jac; it is easier and faster to install the tool anchor plate and tool clamp piece than the original post-card type.

3. The limit plate, tool anchor, and tension jack are separated and independent.

4. Better stability: the conventional post-card tensioning jack for a 3-point piston guide, this series of tensioning jacks for a 4-point piston guide; overcome the 3-point guide eccentric tensioning force often produces the phenomenon of pulling the cylinder scrap jack.

5. It overcomes the shortcomings of cumbersome and inconvenient installation of the overall front card tensioning jack at home and abroad.


Technical Parameter

Wire Stressing Jack Post-Tensioning System for Bridge Construction


ZT MONO STRAND STRESSING ANCHOR

Precautions


1. Before connecting the oil pipe, the oil pipe must be cleaned, especially the nozzle part.

2. Before using the jack, it should be run 3-5 times without load to remove the air in the cavity.

3. During the working process of the jack, the loading should be stable and the unloading should be slow to avoid wire slipping.

4. After the work is finished, the piston returns to its position. Wipe it frequently and keep it clean.

5. If the jack fails, it should be repaired by a person with certain professional knowledge, or returned to the factory for repair.

6. When parked idle or in storage, dust caps should be added to the nozzles to prevent dirt and corrosion from entering.

When the jack is tested or loaded, the staff should stand on both sides, and it is forbidden to stand in the direction of the end face, and protective devices should be installed in dangerous areas.