Grout Injection Pump|Double fluid and the high-pressure variables used in grouting construction
Product description:
A Grout Injection Pump is a stable and durable high-pressure injection pump, that can transport large concentrations of cement slurry, yellow mud, oil and water, and other media.
Products use:
1. Mainly used for charcoal, railway, metallurgy, hydropower, and other departments of the underground work in the excavation of the face (oblique, vertical, flat) to grout water shutters, nudes, or seaside wall plugging water. Maintenance is easy to operate. After hundreds of different conditions under the use of underground grouting works, the effect is very good.
2. 2TGZ-60/210 double liquid speed high-pressure grouting pump is the construction equipment, underground engineering, water conservancy projects, environmental engineering, municipal, subway, tunnel, culvert project seepage plug construction, crack reinforcement of the preferred equipment, Professional water seal construction of the best choice.
Product parameters:
Product number | Stalls | Maximum suction volume L | greatest pressure Mpa | Supporting motor KW | Machine total Kg | Dimensions mm |
2TGZ-60/210 | 1-4 | 60 | 21 | 7.5 | 1050 | 1750*945*1220 |
2TGZ-90/140 | 1-4 | 90 | 14 | 7.5 | 1060 | 1750*945*1220 |
2TGZ-120/105 | 1-4 | 120 | 10 | 11 | 1070 | 1750*945*1220 |
2TGZ-200/150 | 1-4 | 200 | 15 | 18.5 | 1050 | 1750*945*1220 |

Grout Injection Pump Note:
1, before the use of the pneumatic, drove injection pump to be used before the test pump, the duct, suction pipe, the pulp pipe is connected, open the pump for the water test pump, observe the operation of the injection pump, the normal after Note Slurry operations. Common problems for the tracheal connection error, grouting pump can not be normal suction. If the quick connection is used, it is necessary to weld the quick connector (usually Φ25mm) at the inlet of the injection pump. If the connection is made with the horse mouth, pay attention to the diameter of the downhole pipe and the note Inlet diameter of the pump. Connect the air duct before the first pressure air drainage, the windpipe in the water blows clean before connecting the injection pump so that the windpipe dirty water into the injection pump to cause damage.
2, should always pay attention to the pressure gauge instructions, such as pressure gauge instructions or more than pressure, the safety device does not work, should identify the cause, clear the fault and then start.
3, the need to wear the tool with the need to prepare pneumatic driven injection pump the tools used in addition to the pump comes with special tools to need to have a pair of the vise (needle nose pliers, flat nose pliers each one), 16, a wrench, 18 pipe wrench two, screwdriver (plum, a word each) two.
4, note that the pump and the motor structure are normal, when found any fault, should immediately stop, open the drain valve to make the pressure drop, troubleshoot.
5, after mixing the slurry into the pump should be determined by the consistency of the test will be vertical and pulp surface, easy to lay down to the self-weight sink.
6, should always pay attention to make the packing does not make the Grande pressure phenomenon. Such as compression still leakage phenomenon, as the case may replace the packing or piston.
7, the Grout Injection Pump up and down the good transport Notes injection pump up and down the transportation process, to muffler (a total of six), pressure gauge (a), U-type hose (two), gas nozzle vulnerable loss Parts removed, with tools such as bringing down the well to prevent damage or loss, the interface with a good cotton block
8, after the end of each class stop, you must immediately pump water, clean the pipe and pump the internal until it the clean, to ensure that the ball valve, slurry mouth, suction pulp mouth, and drain valve are clean and smooth.
9, grouting volume recorded to the grouting drilling compiled number, record each grouting hole grouting volume and the final pressure of grouting, conditional on each grouting pipe hanging on the card.



FAQ
1. Q: Are you a trading company or a manufacturer?
A: We are an original equipment manufacturer.
2. Q: How long is your delivery time?
A: It is according to the model and quantity.
Generally, it is 3-5 days if the machines are in stock.
It will be 15-30 days if you want to customize the machines.
3. Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer you the sample machine.
But it's not free. You need to pay for the sample and the cost of freight.
4. Q: What are your terms of payment?
A: We accept T/T, Western Union, Money Gram,
Paypal, Alibaba Escrow, etc.
Payment<=USD 5000, 100% in advance.
Payment>=USD 5000, 30% T/T in advance, balance before shipment

Hot Tags: grout injection pump|double fluid and the high-pressure variable used in grouting construction, manufacturers, suppliers, factory, wholesale, buy, cheap, low price