Contact:
Summer Zhu
Mobile/Wechat/Whatsapp: +86 13571973823
Email: summer@ztmineequipment.com
BW250 mud pump
Product Description
XY-2BL Water Well Drilling Rig with crawler drilling for groundwater, bore well drilling machine price, used borehole drilling machine for sale

Applications:
XY-2BL rig is developed based on our XY-2 core drilling rig, integrating the drilling rig, crawler, mud pump, console rack, and other devices into the integral one. It is mainly targeted at the shallow-medium hole of geology core drilling, where mobility is important. It is a modular and integral drilling rig.
Features:
1. Integrated crawler, rig, mud pump, console racks;
2. Crawler, the whole support rig, and a tower with ups and downs are controlled by the hydraulic system of the rig, easy to operate and transport;
3. The whole set of equipment can move to relocate, improve drilling efficiency, reduce labor intensity;
4. The tower has the function of ups and downs, folding, easy walking, and transportation;
5. Rig with more (8 blocks) the speed of progression and reasonable speed range, and the relatively large low-speed torque, a wide range of application.
6. Rig has two reverse gear speeds, easy to deal with incidents;
7. Rig has longer feed stroke as long as 600mm, will help improve drilling efficiency and reduce blocking drill, burning accidents;
8. Rig has double oil pump, less power consumption, lower oil temperature of the hydraulic system;
9. Rig has few control levers, rational layout, flexible and reliable operation;
10. In addition there is a normally closed upper hydraulic chuck on, but also with a lower mechanical man-powered chuck.



| 1 | Drilling depth (NQ drill rod) | Approximately 500m | ||
| 2 | Spindle speed | Forward | 57 ; 99 ; 157 ; 217 ; 270 ; 470 ; 742 ; 1024 | |
| Reverse | 45 ; 212 r/min | |||
| 3 | Spindle Maximum torque | 3200 N@m | ||
| 4 | Spindle max pulling force | 60 KN | ||
| 5 | Spindle stroke | 600 mm | ||
| 6 | Max. the lifting force of the hoist with a single rope | 30 KN | ||
| 7 | The inner diameter of the spindle | 96 mm | ||
| 8 | Retraction distance | 305 mm | ||
| Retraction distance for the host drill rig | 330 mm | |||
| Retraction distance for both drill rig and tower | 160 mm | |||
| 10 | Oil pump | SCB32/12 double gear pump | ||
| 11 | Power unit |
engine power | 30 KW 1500 r/min | |
| electric motor | 22KW 1470 r/min | |||
| 12 | Crawler maximum walking speed | 1.2 km/h | ||
| 13 | Crawler Climbing capacity | 25°, no more than 25 ° | ||
| 14 | Tracked Ground pressure | 0.042 MPa | ||
| 15 | Rig height | 8 m | ||
| 16 | Hook load of the tower | 29.4 kN | ||
| 17 | Max. the static load of crown block beam | 58.8 kN | ||
| 18 | Quantity of pulley | 2 | ||
| 19 | Angle range of tower ups and downs | 0° ~ 90° | ||
| 20 | Rig Dimensions ( tower horizontal position ) | (L*W*H) 4450×2166×3080 mm | ||
| 21 | Total weight | about 5500 kg | ||
Contact:
Summer Zhu
Mobile/Wechat/Whatsapp: +86 13571973823
Email: summer@ztmineequipment.com
Hot Tags: BW250 mud pump worked with a borewell drilling rig, manufacturers, suppliers, factory, wholesale, buy, cheap, low price


