Hydraulic Strand Jack System|Strand Jacking Is Pre-fabricated Building Sections Are Carefully Lifted and Precisely Placed

1 to enhance the equipment small size, light weight, load capacity, easy installation and flexible, especially suitable for small space or indoor large tonnage components to enhance;
2strand jack lifting system with reverse movement self-locking, so that the lifting process is very safe, and the components in the lifting process can be anywhere in the long-term reliable lock;;
3 equipment, high degree of automation, easy operation and flexible, with automatic operation, semi-automatic operation, single point adjustment, manual operation and other modes of operation. Display a liquid crystal display, touch screen display is very intuitive. And the control system with self-error correction protection procedures, even if the error does not cause a security incident.;
With our sincere smile in exchange for customer satisfaction with our services;

Inquiry

  • Product Details

Hydraulic Strand Jack System|Strand Jacking Is Pre-fabricated Building Sections Are Carefully Lifted And Precisely Placed

Product description:

hydraulic strand jack system  is a new type of large-scale lifting equipment, mainly by the ZTS series to enhance the jack, hydraulic pump station, control system components.

Products use:

The technology of this technology is suitable for the overall lifting of the TV tower steel mast antenna and the overall upgrading of large-scale public works grid, roof, steel bridge and other components such as gymnasium, swimming pool, hangar, theater, strand jack animation/ waiting room The overall lift of the main girder of the crane and the slippage of the steel roof truss (cap) of the main terminal of the 

airport terminal.

Hydraulic Strand Jack SystemStrand Jacking Is Pre-fabricated Building Sections Are Carefully Lifted And Precisely Placed.jpg








Product parameters

model

Safe working load

Working pressure

MPA

Cylinder stroke

mm

Retraction height

mm

Jack weight

KG

Fixed anchor weight

KG

boost speed

m/h

Number of strands

Strand diametermm

ZT-TSD15

15

31.5

500

1846

148

3.2

0-25

1

18

ZT-TSD45

45

31.5

500

1726

600

28

0-25

3

18

ZT-TSD60

60

31.5

500

1726

630

32

0-25

4

18

ZT-TSD100

100

31.5

500

1790

930

46

70-25

7

18

ZT-TSD180

180

31.5

500

1886

1560

90

0-25

12

18

ZT-TSD280

280

31.5

500

1938

2330

130

0-25

19

18

ZT-TSD300

300

31.5

500

1940

2460

140

0-25

20

18

ZT-TSD400

400

31.5

500

2100

3396

220

0-25

27

18

ZT-TSD580

580

31.5

500

2220

4980

260

0-25

38

18

ZT-TSD680

680

31.5

500

2180

5410

320

0-25

45

18

ZT-TSD800

800

31.5

500

2200

6880

360

0-25

54

18

ZT-TSD1000

1000

31.5

500

2286

8520

560

0-25

66

18

Enhance the use of the system Note:

First, the strand into the guide tube, pushed into the strand jack animation, under the automatic tool anchor above a person gently holding into the guide tube lead, with the steel wire thrust and move.

Second, when the strand is pierced from the lower part of the cylinder, remove the guide tube lead. Disconnect the strand until it approaches the automatic tool anchor when the speed slows down, aligning the hole through the next automatic tool anchor.

Third, when the strand from the fixed end of the tool anchor is still 4-5 m distance, the chipping into the clip at any time lock, if you need to put the steel stranded, the clip up and then lock up again Stranded through the fixed end of the tool should be inserted into the anchor hole when the clip, the strand into the clip pressure plate hole positioning. The upper part will tension the stranded strand, that is, the steel wire will be locked on the automatic tool anchor clip.

Fourth, to enhance the jack on the upper part of the steel wire than the automatic tool anchor 500mm, wearing a strand when the top of the hydraulic strand jack system  5, division of labor: 1 person responsible for communication, 1 person responsible for laying the film, the hole, others responsible Line; the lower part of the jack is responsible for checking the automatic tool anchor and hole, and finally lead to the tube lead; lower fixed tool anchor 3 people, responsible for wearing clip, observe the strand down, the last lock and so on.

Fifth, when wearing a strand, you have a good communication between the upper and lower communication, and pre-set the threading order, generally can be used before the outside, clockwise or counterclockwise threading order, but also choose to follow the ranks of the line. Threaded the anchor of the tool anchor should be the same with the jack, set the order after the threading. In the stranded under the automatic tool anchor down, we should pay attention to the direction of the laying of the strand jack enerpacwire to pull a certain distance to prevent the fight.

strand jacks lifting Pricelist .jpgstrand jack animation price.jpgbuy discount strand jack enerpac.jpglow price hydraulic strand jack system .jpg

 

Related Products

Colloidal grout mixer            Lock Nut Hydraulic Jack                            Intelligent Prestressed Tension

Mono Strand Pulling Jack    Post tension anchor                                   Hydraulic electric oil pump

Hydraulic Stressing Jack      Anchor Extruder for Post Tensioning      Strand pusher machine

 

Related Products
  • Feedback